FESCO New Connection Fee, Application & Tracking Process
FESCO (Faisalabad Electric Supply Company) plays a crucial role in providing electricity to millions of consumers in Pakistan. As urbanization and population growth continue to surge, the demand for new electricity connections is on the rise.
However, many potential consumers face challenges in navigating the application process for a FESCO New Connection. Here in this article, we will provide a comprehensive guide to obtaining a new connection from FESCO, detailing the procedures, requirements, and tips for a smooth application experience.
About FESCO New Connection Process
Applying for a FESCO New Connection can seem daunting due to the various steps and documentation required. However, FESCO has streamlined this process through both online and offline methods, making it accessible to all consumers.
The primary challenge lies in ensuring that applicants have all the necessary documents ready and understand the steps involved. This article will elucidate the entire procedure, enabling you to successfully obtain your new connection with ease.

FESCO New Connection Procedure
Online Application Process
The online application method is the most efficient way to apply for a new connection. Here’s how you can do it:
- Visit the FESCO ENC Portal: Go to the Electricity New Connection (ENC) system website.
- Create an Account or Log In: If you are a new user, you may need to create an account.
- Select ‘Apply’: Click on the ‘Apply’ button on the sidebar.
- Enter Neighbor’s Reference Number: Input your neighbor’s FESCO reference number; this helps in retrieving necessary information.
- Fill Out Application Form: Provide your personal details and specify the type of connection required (residential or commercial).
- Upload Required Documents:
- Copy of CNIC
- Proof of property ownership
- Recent electricity bill of a neighbor
- Wiring contractor’s test report
- Submit Application: Review all details and submit your application.
Offline Application Process
If you prefer a traditional approach, you can apply offline by following these steps:
- Visit the Nearest FESCO Office: Go to your local FESCO customer service center.
- Obtain Application Form: Request a new connection application form from the staff.
- Complete the Form: Fill out all required fields accurately.
- Attach Necessary Documents: Include copies of your CNIC, property documents, and any other required paperwork.
- Submit Your Application: Hand in your completed application form along with documents to the office staff.
Category-Wise Steps and Estimated Time
FESCO categorizes connections based on load requirements, each with specific procedures and estimated processing times:
| Category | Load Range | Estimated Time |
|---|---|---|
| Category One | Up to 15 kW | Approximately 30 days |
| Category Two | 16 to 70 kW / 400 volts | Approximately 45 days |
| Category Three | 71 to 500 kW / 400 volts | Approximately 60 days |
Category One (Up to 15kW)
For connections up to 15 kW:
- Submit the application at FESCO office or online.
- Processing typically takes about 30 days.
Category Two (16 to 70 kW)
For connections between 16 kW and 70 kW:
- Requires additional documentation and may take around 45 days for processing.
Category Three (71 to 500 kW)
For larger connections:
- Applicants must procure their own transformer.
- Processing time is approximately 60 days.
Change Connection Name/Tariff/Load
If you need to change your existing connection name, tariff, or load:
- Visit the FESCO ENC website.
- Select ‘Change’ from the menu.
- Fill out the necessary details based on what you are changing.
- Attach required documents similar to those needed for a new connection.
- Submit your request online.
FESCO New Connection Tracking
Once you have submitted your application, tracking its status is straightforward:
- Go back to the ENC portal.
- Click on ‘Track’ from the sidebar.
- Enter your tracking ID provided during application submission.
- View your application status.
Tips for Reducing Your FESCO Electricity Bill
To manage electricity costs effectively:
- Use energy-efficient appliances.
- Implement smart home technologies that reduce consumption.
- Regularly monitor usage patterns and adjust accordingly.
Conclusion
In the end, obtaining a FESCO New Connection is a structured process that can be navigated with ease if you follow the outlined steps carefully. Whether applying online or offline, ensure that all required documents are prepared in advance to avoid delays. By understanding each category’s requirements and processing times, applicants can set realistic expectations for when their new connection will be activated.